CHINAT is a team of young management and engineers committing a mission to provide professional subcontracting services on the following areas

Carpentry Works 傳統釘板

System Shutter 模板系統

Aluminum Handset 鋁模系統

Rebar Fixing 扎鐵

Concreting 落石矢

Road & Bridge 馬路及天橋

Cavern & Tunnel 穴洞及隧道

Shaft 豎井

Highrise Building 高層建築

Our Growth (Turnover)

Year 2015 : HK$96millions

Year 2016 : HK$231millions

Year 2017 : HK$267millions

Major Awards & Recognitions

Hong Kong Construction Industry Council

Performance Award 2012 to 2017

  • Gold Prize on Best Subcontractor

  • Award of Excellence on Best Employer

Labour Department, HKSAR

Construction Industry Safety Award Scheme 2017/2018

  • Silver Prize on Civil Engineering Subcontractor

Underpinning Works

Underpinning Works

...underpinning to Island Line's rail tunnel box structure at SIL901, one of the most sophisticate and difficult underpinning works in Hong Kong history...

Tunnel Construction

Tunnel Construction

...Single-track Tunnel construction by system shuttering to the side walls and subsequent crown construction at XRL824 Tai Kong Po-Ngau Tam Mei Express Railway Tunnel (2.7km)...

Modernized Traditional Formwork

Modernized Traditional Formwork

...Hybrid of RMD Alshor and Rapidshor falsework systems and traditional timber formwork makes construction of station box in SIL901 by means of top-down method efficient...

Steel Hybrid System Shuttering

Steel Hybrid System Shuttering

...construction of transition tunnel in XRL822 by means of tailot-made trusses and traditional timber systems, makes the construction of these sophisticate curve structures become economic...

Shaft Construction

Shaft Construction

...90m High shaft construction at Ngau Tam Mei for XRL824, serving as ventilation, facilities and construction shaft, one of the deepest shaft in Express Railway...

Working Safely

Working Safely

...Use of correct PPE include full-body harness becomes one of our common practice...

Miner Works-Tunnel Excavation

Miner Works-Tunnel Excavation

...Miner works on tunnel excavation at HATS2 drainage tunnel in southern Hong Kong Island from Aberdeen to Sai Ying Poon

Field Control & Management

Field Control & Management

...working with major foreign contractors, we understand and learn the importance of field control and management, photo taken at HATS2 Tunnel at a inverted twin cell drainage shutter committing managerial review on safe working practice...

Site Control and Housekeep

Site Control and Housekeep

...we always maintain a high standard of site layout and housekeeping, even in the congested tunnel at XRL822, we still making access of vehicle and pedestrian in sound orders...

Concreting Techniques

Concreting Techniques

...we seldom to use traditional poker vibrator now, but various types of electric poker to deal with site conditions include air-quality control in tunnel and confined space. The photo was taken at XRL822 Shek Yam to Tse Uk Tsuen 7.6km Express Railway Tunnel, we are proud of our production of good concrete products in precise tolerance and finishes...

Supervision-intensive & Cultivation

Supervision-intensive & Cultivation

...we never rely on traditional works approach of subcontracting, instead we cultivate different trades of labour from our own ways. We are maintaining 1 to 8~10 supervisory capacity cultivating our own standards of multi-trade labour. One of the advantage we are gaining is our energized young working team at excellent production speed and capacity...

Cavern Construction

Cavern Construction

...one of the characteristic on cavern construction is "huge". The picture shows one of the largest crown shutter we built at 25m point-to-point span with concreting volume of 220~250m3 per pour, for the Ngau Tam Mei Cavern at XRL822...

Aluminum Handset

Aluminum Handset

...our top management is pioneer on aluminum handset in Hong Kong, from the commencement of Malaysian Mivan System some 20years ago to massive introduction into building construction. We are proud on introducing it into civil engineering works successfully in XRL822, XRL824, XRL810A & SIL901 on specially designed high-capacity aluminum handset system. Our 90mmThk alu handset keeps a record of once-off 26mL x 9.4mH x 300~400mmThk dividing wall construction in XRL822 G Tunnel...

© 2019 May by CHINAT

proudly created with Wix.com